2500m~2高炉主皮带通廊吊装方法在工程建设中的应用
Application of Main Belt Corridor Hoisting Method of Bangang 2500 BF in Construction
祁卫能
宝钢集团新疆八一钢铁有限公司
- 摘 要
- 对新区高炉主皮带通廊结构长度最长、重量最重的第四段通廊吊装进行简单的计算和吊装机具及方法的选择,可在以后工程建设中加以应用,大大缩短了吊装的工期,提高了吊装的安全可靠性和经济合理性。
- 关键词
- 皮带通廊;高空吊装;工期;安全可靠性;经济合理
- 分类号
- TF321.3
- 栏 目
- 实用技术
- 出 处
- 《冶金与材料》2013年第3期,第 48-49 页(共 2 页)
- 出版日期
- 2013-06-15
- 知网数据
- 下载 28 次(截至 2026-09-29)
- Abstract
- Simple calculation was made and hoisting equipment was chosen with the longest and heaviest long belt corridor structure of the C blast furnace in the new area.The method can be applied in the construction later,significantly reduced the duration of the lifting,improving the security and reliability of hoisting with economic rationality.
- Keywords
- belt corridor; Lifting height; project duration; security and reliability; economic rationality